Years

Quick Enquiry

R102/2019 Construction Of The Road Between Wadi Al Qawr Area And Link Road Between Al Hibab R/A And Nazwa Road Pkg 3 - 218

The Ministry of Presidential Affairs developing the road between Wadi Al Qawr area and the link road between Al Hibab R/A and Nazwa road. The Project Involves Improvement of existing dual carriage way (Dubai -Hatta E44) with 2 lanes in each direction to 3 lanes in each direction for a length of 18.6 km which includes 3 Bridges and 1 underpass, 1 Pump station, 4 Ponds. The project also includes Electrical Over Head Cable, Drainage Network, Etisalat, Road Lighting works, Road Signage, Road Barriers, Guard Rails, Drainage Culverts, Camel fence and MSE wall.

  • Client: MOPA-Ministry of Presidential Affairs
  • Location: Sharjah
  • Consultant: Parsons